After the fire in 2019 of this majestic edifice, a symbol of France throughout the world, the time has come for its restoration. Spaciotempo was asked…
To maximize its covered storage capacity and optimize its logistics flow, this customer called on Spaciotempo to install a new demountable building.
We're talking about a recently completed project that embodies Spaciotempo's DNA : flexibility !
To meet the needs that went with the signing of a new international contract, our client found itself in need of a very technical storage building,…
You may have already noticed by walking around the shelves of DIY stores, that most of them have been revamped in the last few years. These works, as…
For our second collaboration with this company, the project consisted of building an awning to house metal parts used for the manufacture of cranes…
For one of its stores, our client called on our teams to create an easy-to-access goods collection area.
An awning with a free span of 35 meters attached to two existing buildings to store cereals sheltered from the rain.
A storage area contiguous to existing buildings to cover outside stocks, sheltered from the rain.
Construction of a permanent storage area of 2,100m² on the customer site, an area for storage on pallets and big bags.